Schedule & Downloads
- DDOT Kickoff Meeting
- Survey & Traffic Data Collection – Spring/Summer 2011
- Existing Conditions Traffic Analysis – Summer 2011
- 1st Public Meeting – June 11, 2011
- DDOT Coordination Meetings – August through October 2011
- Alternative Analysis and Development – September 2011 – January 2012
Alternative Concept Designs for the Corridor:
- Alternative #1 (Road Diet) with Options
- Alternative #2 (Road Diet) with Options
- Alternative #3 Stanton Park Plan
Functional Design Report – coming soon - 2nd Public Meeting – January 28, 2012
- Board and Maps with Voting Dots
- Boards and Treatment Sheets Displayed at Meeting
· Project Goals Meeting Purpose Next Steps Board- Preferred Design based on 2nd Public Meeting Feedback
· Public Feedback Results Board
· Which Road Alternative Do You Prefer Board
· Alternative Traffic Operations Board.pdf
· Low Impact Development Options Board.pdf
· Bicycle Treatment Sheet
· Pedestrian Treatment Sheet.pdf
· Transit Treatment Sheet
- DDOT Coordination Meetings – Winter/Spring 2012
- 30% Preliminary Design Plans – Winter/Spring 2012
- 3rd Public Meeting (with ANC 6A and 6C as invited) – Winter 2012
- 4th Public Meeting (with ANC 6A and 6C as invited) – Summer 2012
Resources
- District of Columbia Bicycle Master Plan
- Capitol Hill Transportation Study (2006)
- District of Columbia Pedestrian Master Plan (2009)
- DDOT Action Agenda
- DC Safe Routes to School
- Capital Bike Share
- Washington Area Bicyclist Association
- Washington Metropolitan Area Transit Authority
DC Bus Route Map
Bus Route X8 (Maryland Avenue Line)