

The reports referenced and linked below summarize the planning studies already created for the Fort Totten Station area.
These reports provide background and context for the new plan to fit well within the City and region.
http://planning.dc.gov
DCOP – Riggs Road and South Dakota Avenue Area Development Plan (March 2009)
http://washington.uli.org/Community%20Outreach/Technical%20Assistance%20Panels.aspx
ULI-TAP Report - Fort Totten Metro Station: Maximizing Potential for TOD (March 2009)
http://www.nps.gov/cwdw/parkmgmt/index.htm
National Park Service – Civil War Defenses of Washington Management Plan
http://ddot.dc.gov
DDOT – Rehabilitation of Riggs Road and South Dakota Avenue NE Intersection
DDOT – South Dakota Avenue Transportation Study (June 2007)
DDOT – Metropolitan Branch Trail Design Concept Plan (2005)
DDOT – Washington DC Pedestrian Master Plan and Design Guidelines (May 2008)
DDOT – Washington DC Bicycle Master Plan (April 2005) and Design Guidelines (December 2006)
DDOT – Transit Alternatives Analysis (DCAA) “DC’s Transit Future” (December 2007)
http://www.wmata.com/about_metro/planning_dev.cfm
WMATA – Station Site and Access Planning Manual (May 2008)
WMATA – Joint Development Policies and Guidelines (November 2008)
WMATA – Adjacent Construction Project Manual (December 2008)
WMATA – Fort Totten Station Access Study (draft version only & not available online)